For more information email us on:
office@structuraltimber.co.uk

Twitter29 Oct RT @TimeForTimber: To build better we must understand building physics, whole life carbon, embodied energy in building materials and in-use…28 Oct RT @PBC_Today: With the @AIMCH2 project reaching the halfway stage, project director Stewart Dalgarno provides an update on its progress to…28 Oct RT @cemidlands: Vince Kesterton of Interserve will be presenting The Nightingale Hospital, Birmingham Case Study at The CE Midlands Summit…28 Oct RT @TimeForTimber: The Insurance Broker's View. We asked Dominic Lion, Associate Director at Gallagher, a global insurance brokerage, risk…

STA Library

Welcome to the New Look STA Document Library

We have recently simplified this area of the website to help members and visitors locate documents.

There are a series of filters below to help you find information you are looking for and you are also able to sort the columns A-Z or Z-A by clicking on the arrows.

Please note, some documents are only available to STA Members and you will be required to login and if you are a visitor to the site, you may need to enter your contact details and by doing this you confirm that you are happy to receive further information from the STA.

If you require help on technical related issues, please call 01174 032497 or email technical@structuraltimber.co.uk


ReportsNEW UPLOADS:

To access the new Research Reports the Structural Timber Association has produced in collaboration with Construction Scotland Innovation Centre (CSIC), the University of Edinburgh and BRE - click here

These include:


FILTERS:

 

Search by document name:

Search By:


Clear Search

35 documents found

Document Title Type Date Download

Site Safe Risk Assessment Checklist

Guidance
Registration Required
13/08/2020  Register or Login

Site Safe policy & audit process V7.5

Guidance
Full Member Only
02/07/2020  Login to download

Technical Document Perimeter fencing

Guidance
Registration Required
 Register or Login

16 Steps to fire safety

Guidance
Registration Required
 Register or Login

Advice Note 7 - Part 5 - Design of escape routes during the construction process

Advice Note
Full Member Only
 Login to download

Advice Note 8.1 - Thermal imaging cameras

Advice Note
Full Member Only
 Login to download

Design Guide During Construction to Separating Distances for Timber Frame Buildings

Guidance
Registration Required
 Register or Login

Design guide to separating distances during construction, Part 4 (For CLT type frame buildings)

Guidance
Registration Required
 Register or Login

Fire Mitigation Product Paper 1

Product Paper
Full Member Only
 Login to download

Fire Mitigation Product Paper 2

Product Paper
Full Member Only
 Login to download

Fire Mitigation Product Paper 3

Guidance, Product Paper
Full Member Only
 Login to download

Fire Mitigation Technical Paper 1

Technical Paper
Full Member Only
 Login to download

Fire Mitigation Technical Paper 2

Technical Paper
Full Member Only
 Login to download

Fire Mitigation Technical Paper 3

Technical Paper
Full Member Only
 Login to download

Fire Risk Management FAQs

Guidance
Registration Required
 Register or Login

Guidance notes on wireless fire alarms

Guidance
Registration Required
 Register or Login

Guide to Construction Phase Fire Risk Mitigation White Paper

Guidance
Registration Required
 Register or Login

HSE Fire Safety in Construction

Guidance
Registration Required
 Register or Login

Technical Note - 2016 - 5 - 16 steps to fire safety summary and cross reference - 31 March 2016

Technical Note
Full Member Only
 Login to download

STA - products that have been tested

Guidance
Full Member Only
 Login to download

STA Product listing to comply with category B and C solutions in the design of separating distances

Guidance
Registration Required
 Register or Login

Product Paper 4 - Product assemblies to achieve different category levels of timber frame

Product Paper
Full Member Only
 Login to download

Product Paper 5 - Guidance for structural timber frame buildings below 250m2 in total floor area

Product Paper
Full Member Only
 Login to download

Fire risk induction pack for site workers

Guidance, Presentation
Full Member Only
 Login to download

Advice Note 15 - Part 1 - Legal responsibilities for fire safety on construction sites

Advice Note
Full Member Only
 Login to download

Advice Note 15 - Part 2 - Understanding the inputs for a fire safety plan

Advice Note
Full Member Only
 Login to download

Advice Note 15 - Part 3 - Detailed explanation of the ‘16 Steps to Fire Safety’ strategy

Advice Note
Full Member Only
 Login to download

SiteSafe policy V 7.2 Template Letters for Members

Guidance
Full Member Only
 Login to download

Site Safe Poster

Guidance
Registration Required
 Register or Login

Product Paper 5 - Appendix 1 Determining overall project size/threshold

Product Paper
Full Member Only
 Login to download

Product Paper 5 - Appendix 2 - How to use the PP5 separation distance tables

Product Paper
Full Member Only
 Login to download

Product Paper 5 - Appendix 3 - Using separation distance tables on sites with multiple units

Product Paper
Full Member Only
 Login to download

Product Paper 5 - Appendix 4 - Using separation distance tables on sites with phased handover

Product Paper
Full Member Only
 Login to download

Product Paper 5 - Appendix 5 - Separation distance tables; key notes and advice

Product Paper
Registration Required
 Register or Login

Technical Note 7.2 - Fasteners for non-wood based sheathing boards

Technical Note
Registration Required
 Register or Login
Kiwa
Stackhouse Poland
Kiwa
Stackhouse Poland
Kiwa
Stackhouse Poland