Fire During Construction

Take a look at the latest news and blogs from the STA

05.12.23

Fire Mitigation Product Paper 4 – Product assemblies to achieve different category levels of structural timber frame

05.12.23

Technical Note 31 – Vocabulary of roles in a structural building project

05.12.23

Fire Mitigation Product Paper 5 – Appendix 5 – Separation distance tables; key notes and advice

05.12.23

Fire Mitigation Product Paper 5 – Appendix 4 – Using separation distance tables on sites with phased handover

05.12.23

Fire Mitigation Product Paper 5 – Appendix 2 – How to use the PP5 separation distance tables

05.12.23

Fire Mitigation Product Paper 5 – Appendix 1 – Determining overall project size/threshold

05.12.23

Advice Note 15 – Part 3 – Detailed explanation of the ‘16 Steps to Fire Safety’ strategy

05.12.23

Advice Note 15 – Part 1 – Legal responsibilities for fire safety on construction sites

05.12.23

Fire risk induction pack for site workers

05.12.23

Fire Mitigation Product Paper 5 – Guidance for structural timber frame buildings below 250m2 in total floor area

05.12.23

Design guide to separating distances during construction

05.12.23

STA – products that have been tested