05.12.23 Fire mitigation product paper 5 – Appendix 5 – Separation distance tables; key notes and advice Read more
05.12.23 Fire mitigation product paper 5 – Appendix 4 – Using separation distance tables on sites with phased handover Read more
05.12.23 Fire mitigation product paper 5 – Appendix 2 – How to use the PP5 separation distance tables Read more
05.12.23 Fire mitigation product paper 5 – Appendix 1 – Determining overall project size/threshold Read more
05.12.23 Technical note 08 – Temporary work platforms over voids – during construction of structural timber buildings Read more
05.12.23 Technical note 03 – Understanding floor to wall interface junctions in structural timber frame Read more
05.12.23 Advice note 15 – Part 3 – Detailed explanation of the ‘16 steps to fire safety’ strategy Read more