05.12.23

Technical note 12 – Cavity barriers around openings

05.12.23

Technical note 15 – Gable panel forces – explanation

05.12.23

STA consumer guide 2 – Mortgage advice

05.12.23

Fire mitigation product paper 5 – Appendix 5 – Separation distance tables; key notes and advice

05.12.23

Fire mitigation product paper 5 – Appendix 4 – Using separation distance tables on sites with phased handover

05.12.23

Fire mitigation product paper 5 – Appendix 2 – How to use the PP5 separation distance tables

05.12.23

Fire mitigation product paper 5 – Appendix 1 – Determining overall project size/threshold

05.12.23

Technical note 08 – Temporary work platforms over voids – during construction of structural timber buildings

05.12.23

Technical note 03 – Understanding floor to wall interface junctions in structural timber frame

05.12.23

Advice note 17 – Gable wall spandrel panels

05.12.23

Advice note 16 – Party wall spandrels

05.12.23

Advice note 15 – Part 3 – Detailed explanation of the ‘16 steps to fire safety’ strategy