05.12.23 Fire Mitigation Product Paper 5 – Appendix 5 – Separation distance tables; key notes and advice Read more
05.12.23 Fire Mitigation Product Paper 5 – Appendix 4 – Using separation distance tables on sites with phased handover Read more
05.12.23 Fire Mitigation Product Paper 5 – Appendix 2 – How to use the PP5 separation distance tables Read more
05.12.23 Fire Mitigation Product Paper 5 – Appendix 1 – Determining overall project size/threshold Read more
05.12.23 Advice Note 15 – Part 3 – Detailed explanation of the ‘16 Steps to Fire Safety’ strategy Read more
05.12.23 Fire Mitigation Product Paper 5 – Guidance for structural timber frame buildings below 250m2 in total floor area Read more